Search inside documents

Search method
Document type

Search results for "waste management"

Including 4 closely related terms such as waste, waste disposal, and waste refuse.

1 result

Boston Borough Council

Direct link to action plan (PDF)

… emissions from a vehicle). • Scope 2: Emissions indirectly emitted from the consumption of purchased electricity, heat or steam. • Scope 3: All other indirect emissions, such as the extraction and production of purchased materials and fuels, transport-related activities in vehicles not owned or controlled by the reporting entity, water consumption, waste disposal, etc ​. This section provides…

…% of renewable energy potential installed o In line with the renewables strategy • All HGVs, including waste refuse vehicles will be zero emission vehicles • The crematorium will no longer use gas-fired furnaces in its operations By 2032 By 2040 By 2036 Carbon reduction opportunities 32 Boston Borough Council Carbon Reduction Plan Carbon reduction opportunities 33 • This section…

…-vehicles Timeline of opportunity implementation 46 2023 • Loft insulation and LEDs at municipal building 2024 • New boiler and HVAC servicing at Municipal building • Rollout of electric vans • Trial of CNG waste refuse vehicle 2025 • Fabric and glazing upgrades at the crematorium • Upgrade all public toilets with LEDs and hand dryers 2026 • Installation of solar carport and BMS…

… system at municipal building 2027 • Installation of Solar PV at crematorium • Rollout of 3 further CNG waste refuse vehicles 2028 • 20% biogas blend used at crematorium furnace 2030…

… Purchased electricity Purchased heating / cooling Scope 3 Indirect Purchased goods & services Capital goods Business travel Fuel & energy related activities Waste from operations Upstream transport & distribution Employee commuting Upstream leased assets Downstream leased assets Investments Use of sold products Franchises Downstream transport & distribution…

Alpha

This is a new service – your feedback will help us improve it.