Search inside documents

Search method
Document type

Search results for "transport"

Including 4 closely related terms such as local transport, domestic transport, and transport plan.

1 result

Royal Borough of Windsor and Maidenhead

Direct link to climate strategy (PDF)

… for the borough. Building on the work we already do 1.13 The council already has strategies and policies in place to support a reduction in carbon emissions. The Local Transport Plan (2012–2026) and Cycling Action Plan (2018-2028) already set out proposals to help reduce emissions from transport and grow the number of cyclists by 50% by 2028. This is significant given the relatively low uptake of cycling…

… stations and the decarbonisation of the electricity grid. It is worth noting the transport sector has seen little change and tackling emissions in this area remains a robust challenge. The steps we are taking to address the transport emission challenge, as well as the challenge of reducing emissions in other areas are outlined in the following chapters. Industrial and commercial Domestic Transport…

… by the energy source used, the type and condition of the buildings (including their insulation), the average ambient temperature (urban areas can be much warmer and therefore easier to heat than rural areas), and the behaviour of occupants. Transport sector emission sources 2.14 Transport emissions are made up of road transport. Emissions estimates are made based on the distribution of traffic…

… transport choices. Objectives: • Transform transport and digital infrastructure to reduce the need for travel. • Create infrastructure to shift journeys to low/zero carbon modes e.g. cycling, public transport . • Invest in zero emission vehicle infrastructure. Page 23 Theme 1 - Circular Economy 3.9 Aim: Reduce waste and consumption, increase material re-use and increase recycling rates…

… the decarbonisation targets will be set out in the forthcoming revision to the Local Transport Plan (LTP). Between now and 2025 there are several actions we will undertake which are detailed in the action plan contained in the next section of this document. Page 28 4. Initial action plan - 2020-25 4.1 In the following section, we set out actions identified to support the realisation of our vision, aims…

Alpha

This is a new service – your feedback will help us improve it.