Search inside documents

Search method
Document type

Search results for "street lighting"

Including the closely related term lighting.

1 result

Newark and Sherwood District Council

Direct link to climate strategy (PDF)

… Potential emissions from Council operated buildings in 2035 Electricity [tCO2e] Gas [tCO2e] 0 100 200 300 400 500 600 700 Newark Sports and Fitness Centre Dukeries Leisure Centre Castle House Palace Theatre Brunel Drive Depot Newark Beacon National Civil War Centre Blidworth Leisure Centre Lorry Park Lighting Vicar Water Visitor Centre Lincoln Road Sports Pavillion Newark Lorry Drivers…

…' Toilets and Service Area Sconce and Devon Park Management Building Car Park Lighting (London Road) Bridge Lighting Pillar Electricity and gas consumption across NSDC operated buildings (tCO2e) Electricity emissions [tCO2e] Gas emissions [tCO2e] Hotspot: Energy consumption from Council operated buildings Leisure Centres Emission reduction project opportunities were identified at Newark…

… Sports & Fitness Centre, Blidworth and Dukeries Leisure Centres. Measures included: Electrification of Heating • Installation of Ground Source Heat Pump at Newark, Air Source Heat Pump at Lincoln Road Sports Pavilion • Reduce reliance on gas • kWh savings: 1.3 million kWh • Lifetime CO2 savings: 3,100 tCO2e Lighting Upgrades • Upgrade all old light fittings to new LED luminaires • Fully…

… Theatre, National Civil War Centre, Vicar Water Visitor House, Newark Beacon, Lorry Park service area and Brunel Drive Depot. Measures included: Electrification of Heating • Installation of Air Source Heat Pumps at all sites • Reduce reliance on gas • kWh savings: 581,000 kWh • Lifetime CO2 savings: 2,005 tCO2e Lighting Upgrades • Upgrade all old light fittings to new LED luminaires • Fully upgrade…

… collection programme It is recommended that Newark and Sherwood District Council work with their leaseholders to establish a data collection programme that will improve the understanding of consumption on these sites. Through a programme of engagement, they can then work with leaseholders to implement carbon reduction measures. Primary measures should be: Building Fabric Upgrades LED Lighting Solar…

Alpha

This is a new service – your feedback will help us improve it.