Including 10 closely related terms such as solar panels, solar panel, and panel.
… and support them to create wider networks for action. Case Studies 04 4.1 EFFICIENT ENERGY CONSUMPTION CASE STUDY: FUTURES PARK SOLAR PANELS In 2012 Rossendale Borough Council installed solar panels on its Futures Park offices. The installation of the solar panels was a £112,000 investment for our future within a 25 year plan. In the eight years since the solar panels were installed…
… they have produced 553,043 KWH of electricity and for every KWH produced we receive 11.5p from the Government subsidy - The Feed in Tariff (FIT). Over this period the total FIT is £63,599. Through the solar panels, we are producing approximately a third of the electricity we need for Futures Park therefore we no longer need to purchase this from the National Grid at the cost 12.5 per KWH making…
… an annual approximate saving of £4,000 and a total saving over the eight years of £32,000. Unused electricity produced through the solar panels is exported back into the National Grid for which we are paid 4.5p KWH. Annually this equates to £1,500. £32,000 Saved in the 8 years since investment in solar panels 4.2 SUSTAINABLE TRANSPORT CASE STUDY: ELECTRONIC INFRASTRUCTURE Rossendale…