Including 5 closely related terms such as photovoltaic, photovoltaic, and panel.
… between Black Dog Way and Estcourt Road. viii. £894,000 schools buildings investment in support of additional pupil places High School, Leckhampton (new secondary school) – includes proposals for 718 photovoltaic (PV) panels on the roof to provide 100% reduction in CO2 emissions, Air Source Heat Pump (ASHP) and green wall – cost £600,000. Winchcombe Secondary School – new sports hall…
… underway Medium and long term measures 11. Work with our partners to ensure that all new public buildings and residential and commercial developments support the move to zero carbon and improve resilience Schools buildings investment in support of additional pupil places: High School, Leckhampton (new secondary school) – 718 photovoltaic (PV) panels on the roof to provide 100% reduction…
… is planned to determine the ‘emissions gap’ and route to Net Zero by 2050 and 80% reduction by 2030. 18. Identify the potential for renewable energy generation on public sector land in Gloucestershire and set a 2025 target High School, Leckhampton (new secondary school) – 718 photovoltaic (PV) panels on the roof to provide 100% reduction in CO2 emissions, Air Source Heat Pump (ASHP), green wall…
…, ‘Executive Director's Report: Economy, Environment & Infrastructure, Gloucestershire County Council. Location/Contact for inspection of Background Documents As above Main Consultees Whilst this report has not been consulted on directly, many of the actions within it arise from consultation and work with partners, including public consultation and work with the Youth Climate Panel…
… and remodelling of existing teaching blocks – the sports hall will achieve around 60% betterment on current building regulations through PV panels and associated wiring to the new Sports Hall mono-pitch lower roof. Hybrid ASHP installed and energy efficiency upgrades by enhancing insulation to the ground floor, external walls and roof areas of the refurbished building. Cost around £100,000…