Including 14 closely related terms such as photovoltaic, photovoltaic, and solar panels.
…% reduction in CO2 emissions from the 2014/15 2700 tonne baseline. This will mean a further reduction of 284 tonnes through the installation of solar panels and LED lighting, the replacement of old gas boilers with more efficient ones, and working with HTS to identify further savings. This target is achievable and takes into account the current state of development of those technologies, which we…
…. The work in the next five years in relation to the Council’s property portfolio will focus on the continuation of the rollout of the LED lighting programme, developing the use of photovoltaic panels on Council buildings and the upgrades to heating boilers in Council buildings. The savings generated by upgrades to the Playhouse, Latton Bush and Mead Park buildings are included in this report…
…, with further potential savings to be identified as options are developed for the Civic Centre heating system. Action Timescales and status Performance measurement /monitoring Level of impact Installing photovoltaic panels on all public council buildings within the next two years. 2022 – work underway No. kWh generated by panels on annual basis Low 1 tonnes of CO2e…
…% target: Action Tonnes CO2e saved per annum % of 284 tonne savings target PV panel installation 1 0.35 LED lighting installation at Civic Centre (2021/22) 0.5 0.17 Boiler replacement at Mead Park (2022/23) 74 26 Boiler replacement at Playhouse (2022/23) 90 31.6 Boiler replacement at Latton Bush Centre (2023/24) 50 17.6 LED lighting installation for Harlow Council…