Including 10 closely related terms such as photovoltaic, photovoltaic, and solar.
…, not necessarily just in Monmouthshire) Progress beginning to be made USING RENEWABLE ENERGY – Speed up the move from fossil fuels to renewable energy Build and operate two new solar farms – subject to national grid capacity Energy Officer Welsh Government Energy Service preparing grid application and developing outline design for one potential Local Development Plan (LDP) solar farm site…
… Property Fleet & Facilities The County Hall scheme is now being progressed with the support of Welsh Government Energy Service. This will be used as a model that can be rolled out to other sites. Planning applications submitted for 2 smaller solar photovoltaic car port schemes as part of Re:fit Phase 1 with a third being considered, all 3 for delivery 2021/22. (Electric Vehicle Charging…
… (interest free loans repaid from savings) has been awarded and Phase 1 of the Refit scheme has started. Phase 1 works to begin on site May-21. Majority of Energy Conservation Measures (solar PV, LED lighting, boiler upgrades etc) to be installed by Sep-21. Opportunities for Phase 2 and upscaling of maintenance works being considered for 2021/22. Progressing as planned Reduce CO2 emissions from…
… our energy supply Energy Officer Electricity: 2020 Heat: 2030 Energy consumption in buildings has reduced as a result of Covid. All electricity supplies either on or moving to 100% green tariffs. New / additional solar PV installations to be delivered at 13 sites in 2021/22 under Re:fit Phase 1. Options to decarbonise heat (heat pumps, district heat, carbon offsetting) being…
… to confirm viability and business case assumptions. Initial feasibility studies for two other potential sites to be reviewed and progressed if and when development / grid connection / business case opportunities can be confirmed. Progressing as planned Install photovoltaic canopies at council owned car parks to power electric vehicle charge points with renewable energy Head of Commercial…