Search inside documents

Search method
Document type

Search results for "solar panels"

Including 6 closely related terms such as panel, solar, and solar park.

1 result

Tunbridge Wells Borough Council

Direct link to action plan (PDF)

… maintenance contract were assumed to abate in a linear fashion from current levels to net zero over the course of the next contract. This would be built into the tender specifications at contract renewal in 2021 with net zero by 2026. • As the Council own the leisure centres, the emissions from these buildings were included within the council’s own estate. • Investment in a solar farm

…. 2.15 The scenarios with the most impact are: - • Investment in a solar park reaches net zero without offsetting. In effect this is to be expected as the solar park creates a positive carbon impact, counteracting those emissions that have not yet abated. All other scenarios include offsetting from 2030. • Increased LED and ASHP roll out and investment in PEPPPA (yellow line) also…

… and green electricity procurement through PEPPPA’s (yellow and dark blue lines). • Developing a solar farm, but requires significant upfront investment, (approx. £8M), which is unlikely to be considered as a potential realistic opportunity for the council. 2.18 It is recognised that ‘Green Basket’ electricity purchase and PPA’s provide the easiest access to green electricity…

… 1,158 Central Scenario - 40% ER 0.40 920 Increased LED (60%) & ASHP’s (80%) & 5% ER 2.14 855 Increased LED, ASHPs & PEPPPA (5% ER) 2.14 498 With Solar Park (owned or 3rd party) 8.93 0 Table 1: Initial modelled high level financial assessment. 3. Corporate Carbon Descent Plan 3.1 Developing a Corporate Carbon Descent Plan based around the carbon reduction pathway…

… Report of the Climate Emergency Advisory Panel - Corporate Carbon Reduction Plan Page 1 of 20 Tunbridge Wells Borough Council Report of the Climate Emergency Advisory Panel - Corporate Carbon Reduction Plan Report of the Climate Emergency Advisory Panel - Corporate Carbon Reduction Plan For Cabinet on 11 March 2021…

Alpha

This is a new service – your feedback will help us improve it.