Including the closely related terms solar, and solar farm.
… Lighting Replacement Programme – over 15000 columns switched. Solar PV installed at various Council sites – producing over 750,000 kWh of renewable energy. Installation of a 1.25 MW Solar Farm in Widnes producing energy for the DCBL Stadium – producing on average 900,000kwh per annum. Retrofit of the DCBL stadium to install air source heat pumps and LED throughout the building and at pitch…
… and Rutland House. Completion of initial phase by 31.3.23. Completion of further phases by 31.3.32. Divisional Manager Property B6 Irrespective of B4 above, develop a Solar/PV installation programme to suitable Corporate buildings on a phased basis, subject to funding. Completion by 31.3.32. Divisional Manager Property B7 Ensure carbon reduction is a key feature of the design and construction…