Including the closely related term solar.
…, ensuring they comply with the requirements of the fund i.e. payback no more than 8 years and to a maximum cost of £250 per tonne of carbon dioxide saved. Planned and future projects Table 3 - Carbon Savings Projects 2019-2021 Project Amount of Savings (kWh, Tonnes) Carbon Savings (tCO2e) Clyde Valley Residual Waste Project 33,202 19,474 NDEE Phase 1- boiler upgrades and solar…
… thermal install 604,957 186 NDEE Phase 1- CHP install 497,882 92 NDEE Phase 1- LED lighting upgrades 1,333,508 410 LED (Street Lighting) - other 58,000 18 LED (Street Lighting) 1,117,260 343 NDEE Phase 2 Lighting upgrade 800,973 246 NDEE Phase 2 Boiler upgrade 339,834 61 NDEE Phase 2 CHP Install 476,235 88 Average savings used to project for 2021/22 savings (kWh) 9,014,650 2,769…