Search inside documents

Search method
Document type

Search results for "renewable energy"

Including 5 closely related terms such as renewable, renewable energy, and renewable energy technologies.

1 result

West Dunbartonshire Council

Direct link to action plan (PDF)

…. • Develop and implement a Council water consumption reduction strategy for Council buildings. • Review the Council’s estate to explore the full potential for installation of renewable energy technologies. Where feasible and cost effective, accelerate the implementation of renewables projects. • Develop and implement a Renewable Energy Strategy. • Where feasible and cost effective, the Council…

… developments, whilst minimising overheating risks. • Where feasible, we will consider options to retrofit, renovate and maintain existing domestic buildings over the construction of new buildings and developments. • Where feasible and cost effective, implement domestic building sustainability, energy efficiency or design standards which go beyond standard mandatory regulations. In all decisions…

… for all areas of West Dunbartonshire - in line with mandatory requirements from Scottish Government. After the initial LHEES for Clydebank, the Council will identify future areas based on their levels of fuel poverty and the level of requirement needed for energy efficiency and renewable energy interventions. The parameters/criteria of what is required will be identified based on the specific…

…% reduction by 2020 (replacing the original 50% target); • 75% reduction by 2030; • 90% reduction by 2040; and • ‘Net Zero’ emissions by 2045. The commissioning of the project aligned with the renewal of the Council’s Energy Strategy and Carbon Management Plan, providing an ideal opportunity to integrate all documents into one Climate Change Strategy. Whilst the climate emergency has focused minds…

… and challenges which both influence and limit the ability to deliver local climate action (mitigation and Adaptation). Identified challenges include (but are not limited to): • Funding availability – delivery of many actions will require resources, capital works and investment by the Council – e.g. enhanced energy efficiency measures, and heating and renewables projects in both domestic…

Alpha

This is a new service – your feedback will help us improve it.