Including the closely related terms renewable energy, and renewable.
… measures. Public Toilets Install energy efficiency measures to reduce electricity consumption. Geoff Moulder Leisure Complex Relocate to new energy efficient site. Crematorium Install energy efficiency and renewable energy measures. Fleet Electrify vans in fleet. Trial and roll out electric RCVs. Business Travel and Commuting Encourage low carbon transport modes and mileage…
… any costs associated with large scale construction or property rationalisation. The project proposals in this plan have been based on high level and remotely accessed information and benchmarks. All projects will require full feasibility assessments to be undertaken to establish a detailed cost-benefit analysis. Municipal Buildings Upgrade fabric and heating systems. Install renewable energy…
… energy potential from solar PV will be known o Feasibility studies of all council owned buildings, roof space, car parks and land assets should be carried out and summarised within a renewable strategy • Engage with key suppliers to communicate importance of emissions reduction in procurement decisions • Install water saving accessories across all operational facilities • Waste tonnage and type…
… practically possible • Charging infrastructure at main council buildings will have been installed • Trial of CNG HGV will have been undertaken • All buildings will have up-to-date, standardised, and effective building management systems (BMS) • Boston Borough Council will have 50% of renewable energy potential installed o Developed in line with the renewables strategy • Supplier commitment to reducing…
…% of renewable energy potential installed o In line with the renewables strategy • All HGVs, including waste refuse vehicles will be zero emission vehicles • The crematorium will no longer use gas-fired furnaces in its operations By 2032 By 2040 By 2036 Carbon reduction opportunities 32 Boston Borough Council Carbon Reduction Plan Carbon reduction opportunities 33 • This section…