Search inside documents

Search method
Document type

Search results for "public consultation"

Including the closely related term consultation.

1 result

Bristol City Council

Direct link to document (PDF)

…: GB0005a-Exeter Climate zone: 4: Warm-temperate Altitude of location: 12 m Home owner / Client: Street: Postcode/City: Province/Country: Architecture: Mechanical engineer: Street: Street: Postcode/City: Postcode/City: Province/Country: Province/Country: Energy consultancy: Certification: Street: Street: Postcode/City: Postcode/City: Province/Country: Province/Country: Year…

… in their recent response to the Future Homes Consultation. Changes include modest improvements to insulation, shower drain wastewater heat recovery and roof mounted solar PV. While heating is still based on a gas boiler, it is possible that developers could use heat pumps instead of wastewater heat recovery and solar PV to achieve the required performance. Airtightness is relatively poor at 5m3/m2hr…

… and ventilation is achieved mechanically without heat recovery. Part L 2025 This scenario is also based on an additional notional building specification provided by the government in their response to the Future Homes Standard Consultation. Insulation levels and glazing performance are increased close to that required for Passivhaus, however airtightness remains poor at 5m3/m2hr and no heat recovery…

Alpha

This is a new service – your feedback will help us improve it.