electricity COMPLETE - From 1st April 2021, when our energy accounts as part of CCS framework swap from British Gas (BG) to EDF, we will be placed on their Blue for Business tariff which used 100% low carbon energy. This exercise has gone partially beyond the original existing EDF contracts i.e. 19 rather than 4 contracts and includes the BG electricity contracts which are for smaller sites e.g. toilets…

… higher than target due to the required use of a generator as the permanent power became routed to the main building in the latter stage of the build. The main building is on a 'low carbon' energy tariff. As a whole, environmental performance ran at top marks (9/9) throughout. Excess carbon production will be offset by the carbon offset scheme used by the construction company. They have/will fund…

… at Link Road has been investigated and is feasible and confirmation on future configuration of the site is being sought. ü ü 1.6.5 BELL STREET - Install e-chargers appropriate to demand identified during audit. COMPLETE - 2 chargers have now been installed. ü ü 1.7 Investigate opportunities for use of 100% renewable energy for council estate - ü 1.7.1 Investigate/procure 100% low-carbon

…, so is a positive move. The intention once further contract renegotiation is possible is to look to move to 100% renewable. ü 1.7.2 Investigate potential opportunity to procure 100% low carbon gas Green Gas is gas from lower fossil fuels, i.e. waste biogas. It currently has limited availability in the UK. Evaluate again in 2022 ü 1.7.3 Install LEDs at all external lamp columns on Council's own…

… boreholes and low carbon stoves in Uganda and plant 10,000 trees during 2021. ü 1.9 HARTHAM - Achieve BREEAM Excellent standard for new development Completion is programmed for December 2022. The building is being designed to reduce thermal gain (orientation and window location/sizes – passive design measures), lighting is specified to be very energy efficient (LEDs), and PVs and/or heat pumps…