Search inside documents

Search method
Document type

Search results for "leisure centres"

Including the closely related terms leisure centre, and leisure centres.

1 result

West Lindsey District Council

Direct link to action plan (PDF)

… with decarbonisation ambitions Internal costs only 0 Instant 21.09 0 Transport Incorporate fuel efficient driving into driver training and refresher courses 8,000 10,800 0.8 26.43 303 Transport Replacement of manager vans with electric vehicles 12,000 3,900 3.1 15.17 791 Transport Waste and Street Cleansing fleet electrification 6,264,000 17,300 362.5 865.93 7,234 Leisure Centres Require third-party…

… operators to implement a formal energy management system, e.g. ISO 50001 Internal costs only 0 Instant 26.54 0 Leisure Centres Implement requirement for third-party operators to report energy/carbon performance of buildings, at least annually Internal costs only 0 Instant 10.61 0 Leisure Centres Compile plant and equipment inventory and work with site operators to implement a replacement…

… schedule based on life cycle analysis Internal costs only 0 Instant 39.46 0 Leisure Centres Solar PV at Market Rasen Leisure Centre 18,000 1,912 9.4 5.03 3,576 Council Buildings Implement a formal energy management system to cover all major energy consuming sites Internal costs only 1,900 Instant 6.87 0 Council Buildings Compile HVAC plant inventory and implement a replacement schedule based…

… of benchmarksCalculating a carbon footprint West Lindsey District Council FY 19/20 Footprint 10 West Lindsey District Council’s total measured carbon footprint for the 2019/20 financial year is 3,428 tonnes of CO2 equivalent (tCO2e). • Scope of emissions: 69% of the footprint is associated with scope 3 emissions from leased buildings, leisure centres, business travel and commuting, water and waste. Scope 1…

… emissions account for 25% of the overall footprint, whilst scope 2 emissions account for the remaining 6%. • Emissions by activity: Approximately 55% of the measured footprint emissions are associated with electricity and gas use across the council’s leased buildings. This includes emissions across the Gainsborough and Market Rasen Leisure Centre facilities, which account for 16% of the overall…

Alpha

This is a new service – your feedback will help us improve it.