Including the closely related term leisure centre.
… when procuring the new Leisure Centre management contract 2021- 23 D £ M O9 Conclude the lighting replacement programme in Car parks with one final car park 2020 D £ L O10 Cranleigh Leisure Centre - Carry out an energy audit to establish what work would be required to build the new leisure center in Cranleigh as carbon neutral as possible. To include a step-by-step list…
… of emissions versus costs. 2020 D £ L O11 Improvements in Energy Efficiency at Farnham Leisure Centre – Install a 90 kW Combined Heat and Power Plant. Project details provided by a technical report Installation of pool covers to reduce evaporation, heat loss from the pool will reduce the need for ventilation from the pool hall. Replace 12 showers in the members changing rooms with ones…
… that have reduced flow rate. Fit insulation jackets on steel sand filters. 2021 D/E Appro x. £300k L W W Carbon Neutrality Action Plan – V10 Final 27 Replace the existing pool hall and gym windows with new triple glazing with a double soft heat reflective coating. Review operation of AHU and explore more efficient options. O12 Haslemere Leisure Centre - Replace…
… the existing Pool hall lighting with LED equivalents 2021 D/E £ L O13 Edge Leisure Centre - Replace the existing sports hall lighting with LED equivalents. The energy savings are likely to be on the region of 50%. 2021 D/E £15k L O14 Work with Housing…