… reduction focus areas would be on high gas consumers such as Woods Close and Manners Street to better understand reasons for apparently poor energy performance. These sites could be targeted for heat electrification pilot projects (e.g. heat pumps). Please note that this data was provided retrospectively, and does not relate to the financial data utilised for the initial footprint. 0 5,000 10,000…
… and potential options for efficiency improvements and/or low carbon heat sources such as heat pumps. 0 50,000 100,000 150,000 200,000 250,000 300,000 350,000 Tenter Court Edmonds Close St Martins Close Benedict Court Clare Close Central Place Greyfriars Belton Avenue Centerbury Close Sandon Close St Nicholas Close Sherwood Rise St Clements Community Centres. Absolute consumption kWh / Yr…
… system: gas boiler • Replacement of existing boiler system with more efficient gas boilers. • 51 tCO2/year saving • 243,070 kWh/year gas saving • 5,024 GBP/year cost saving • £35,000 capital cost 4b. Upgrade heating system: ASHP • Electrification of heating system with an air source heat pump (ASHP) • 137 tCO2/year saving • 762,024 kWh/year gas saving • 643 GBP/year cost saving…
… heat pump (ASHP) • 55 tCO2/year saving • 305,182 kWh/year gas saving • 184 GBP/year cost saving • £85,000 capital cost 5a. Upgrade heating system: gas boiler • Replacement of existing boiler system with more efficient gas boilers. • 20 tCO2/year saving • 96,846 kWh/year gas saving • 2,152 GBP/year cost saving • £20,000 capital cost 4. Upgrade AHU fans & VSDs • Upgrade to EC plug…
… Council operated buildings…. …..equating to 17.7 % of the overall footprint Gas is required for space and water heating in buildings. The Council consumed 6,415,665 kWh of gas in the financial year, 61.8% of which was in Housing Revenue Account (HRA) assets. As the national grid decarbonises, it is recommended that heat sources are electrified where possible (e.g. through the installation of heat…