… Recommended actions Key Stakeholders 5 Delivery of the Feasibility studies at operational buildings, to support definition of the 2023/24 Carbon Budget by January 2023, which includes: Pilot study design and feasibility study specification Heat pump study specification (both ground and air source) Property and Facilities Management APPENDIX 1 Item: 14 Page: 386 Route Map 2030…
… Identify the synergies with concurrent activity including the Non Domestic Energy Efficiency Fund Identify roofs on buildings that are suitable for the installation of PV and the enabling works required to allow PV to be installed Finalise 2023/24 Carbon Budget This should include the following elements: Design heat pump pilot studies and develop specification for the survey…
… Contract review EV / H2 Fleet infrastructure gap analysis Develop Re- use business case Collect pilot data and develop specifications for archetypes Heat pump studies Set up central Climate assurance and reporting function and dashboard Set up central steering group Define clear carbon roles & responsibilities including capability and capacity gap analysis Update property…
… of the interventions in the MACC are calculated by the Council’s new Carbon Budget Toolkit using a large set of benchmark data of similar buildings throughout the UK. APPENDIX 1 Item: 14 Page: 396 Route Map 2030 and Beyond (DRAFT) | 17 Figure 7: Extract from Property’s 2030 Route Map Marginal Abatement Cost Curve (MACC) Example Primary School Air Source Heat Pump (realising 600 tCO2e reduction…