… an investment which will generate an ongoing income stream 9 13.23% Offset up to +140% There is space on Salt Ayre tip to locate a 25MW solar farm This would need to be connected to the grid. The initial cost of grid connection is £1.4M so it makes financial sense to deck it out to the maximum The site could be decked in stages. 5MW would generate 4,484,700kWh pa of renewable energy…