Including 5 closely related terms such as strategic flood risk, flood resilience, and flood risk.
… 7.2. Actions 19 8. Actions Under NI188 guidelines 21 8.1. Level 1 NI188 22 8.2. Level 2 NI188 23 9. ‘Quick wins’: additional action plan 26 9.1. Where we are now 26 9.1.1. Flood and Water Management Act, April 2010 26 9.1.2. Drain London 27 9.1.3. Strategic Flood Risk Assessment 27 food risk 289.1.3.1.Managing 9.1.3.2.Flood resistance 29 9.1.3.3.Flood resilience 29 9.1.4. Sustainable…
… Infrastructure Report (2010) (draft) • LBC: Croydon’s Infrastructure Delivery Plan • LBC: The draft Biodiversity Action Plan • LBC: The Strategic Flood Risk Assessment (2008) • LBC: Surface Water Management Plan. Phase 1 Scoping Study – Final Draft (2010) • LBC: LCLIP • London Climate Change Partnership, Adapting to Climate Change, Creating Natural Resilience, Technical Report • City of London…