Search inside documents

Search method
Document type

Search results for "external wall insulation"

Including 4 closely related terms such as wall insulation, insulation, and wall insulation.

1 result

Boston Borough Council

Direct link to action plan (PDF)

… but improved comfort levels. N/A N/A 2025 N/A N/A N/A 13 Upgrade cavity wall insulation Upgrade cavity wall insulation in the chapel as far as possible Gas: 3,592 0.7 2025 0.7 ~£4,000 37.8 14 Loft insulation Install loft insulation in the chapel Gas: 1,734 0.3 2025 0.3 ~£1,300 25.8 15 Solar PV Install Solar PV on the chapel roof Electricity: 27,538 6.4 2027 5.2 ~£32,000 10.6 16 Use biogas blend…

… in age and fabric standard. The original building is a 1908, solid brick construction, with little to no existing insulation or glazing. A second building is also solid brick, with no insulation, but does have some glazing measures in place. Finally, the new structure has some insulation and glazing installed and is built to a higher specification. • The Municipal Buildings make up 17% of all…

… Opportunity Description Energy saving (kWh)* Baseline GHG saving (tCO2e) Implementation year Implementation year GHG saving (tCO2e) CapEx Payback period (yr) 1 Loft insulation Installation of loft insulation in the Municipal Buildings Gas: 6,346 Electricity: 2,965 1.9 2023 1.7 ~£9,000 17.5 2 LED lighting in ‘new’ building Installation of LED lighting in the newest section of the Municipal…

… in the heating systems and cremator furnace. 13% of emissions for the crematorium are attributed to electricity consumption for lighting and technical equipment in the cremator furnace. • The crematorium and chapel buildings are currently fairly poor energy efficiency buildings. Recommendations centre around building fabric upgrades, such as installation of cavity wall and loft insulation in the chapel…

…-vehicles Timeline of opportunity implementation 46 2023 • Loft insulation and LEDs at municipal building 2024 • New boiler and HVAC servicing at Municipal building • Rollout of electric vans • Trial of CNG waste refuse vehicle 2025 • Fabric and glazing upgrades at the crematorium • Upgrade all public toilets with LEDs and hand dryers 2026 • Installation of solar carport and BMS…

Alpha

This is a new service – your feedback will help us improve it.