Search inside documents

Search method
Document type

Search results for "energy usage"

Including 6 closely related terms such as electricity consumption, building energy, and energy efficiency.

1 result

Boston Borough Council

Direct link to action plan (PDF)

… measures. Public Toilets Install energy efficiency measures to reduce electricity consumption. Geoff Moulder Leisure Complex Relocate to new energy efficient site. Crematorium Install energy efficiency and renewable energy measures. Fleet Electrify vans in fleet. Trial and roll out electric RCVs. Business Travel and Commuting Encourage low carbon transport modes and mileage…

… will require energy efficiency measures and switching heating modes, e.g. air source heat pumps. • As a result of these measures, electricity consumption, and costs associated with Scope 2 emissions, will increase over time. Due to the rate of grid decarbonisation, it is unlikely that scope 2 emissions themselves will increase. Hence measures should also be taken to reduce electricity consumption across all…

…. • Leased building emissions are scope 3 and therefore BBC does not have direct control over them. It is important that BBC influence and engage with building occupants to adopt energy efficiency and fuel switching measures. Emissions from consumption of gas and electricity at BBC leased buildings 0 200000 400000 600000 800000 1000000 1200000 1400000 1600000 k W h Total Electricity

…. This “greening of the grid” makes electrification of transport and heating an attractive option from a carbon reduction perspective and electrification should be a priority. • The carbon savings potential of projects outlined in this report are reported in terms of savings today and savings in recommended implementation year. For projects which reduce electricity consumption, i.e energy efficiency

… operational emissions. 62% of emissions from the Municipal Buildings arise from electricity consumption and 38% from fuel used in building energy. • It is expected the Council will remain in the Municipal Buildings in the mid-term (5 – 10 years), however, are open to the possibility of moving premises due to the challenges associated with upgrading the fabric and heating systems at the site. Projects…

Alpha

This is a new service – your feedback will help us improve it.