Including 6 closely related terms such as manage, energy use, and energy saving.
… and vehicles. • Scope 2 emissions are associated with purchased electricity, heat, steam and cooling. These indirect emissions are a consequence of the Council’s energy use but occur at sources not owned or controlled by the Council including grid supplied electricity and heat provided through a heat network. The Council’s Scope 1 and 2 energy and fuel use emissions for 2019 amount to 11,476…
… delivery team Costs to be identified likely to include £300,000 design cost RED A more efficient building resulting in reduced emissions. A holistic approach aims to reduce energy consumption to its lowest levels through behavioural and technical changes. Renewables can then be considered. Tackling the building will result in greater energy savings. Property Services 1 1.1b…
… of actions taken NB - the recommendation is for all new buildings to achieve a mandatory 'A rated' EPC Plan to be developed in line with the Energy Strategy TBC but Internal delivery as part of service management GREEN Produce an Energy Design Brief, which will set out the considerations and targets for all new and retrofit projects (September 2021). Embed energy reduction as part…
… unexpected consumption increases and/or issues that is informed by an effective use of insight. Established early risk warning measures. Reports will also allow the Energy Manager to determine areas that need Property Services 1 8 Reference Action Description Timescale Resources / Cost Implications RAG Status Outputs, outcomes and benefits Lead Service Priority (1 – 5…
…) investment to reduce energy consumption along with low and no cost measures. 1.1e Commission energy surveys to identify potential energy saving projects, starting with the ‘Top 23’ energy consuming sites / assets December 2022 September 2026 TBC Internal delivery as part of service management plus consultation costs AMBER Identification of further opportunities to commission…