Including 10 closely related terms such as manage, management, and energy projects.
… 2035 2036 2037 2038 2039 2040 Project Emissions Target Emissions BAU Emissions Overview of the Carbon Reduction Pathway Executive summary Projection of total ELDC business as usual emissions, the effect of proposed projects and the ‘net-zero by 2040’ target NB. projected UK grid electricity decarbonisation is included within the BAU pathway R1 – Energy Management R2 – Mileage Management R3…
… capture of CO2 from the air. ELDC has committed to a net-zero target, which requires any residual emissions to be addressed using greenhouse gas (GHG) removals only. This is in contrast to a carbon neutral target under which avoided emissions carbon offsets (e.g. investing in renewable energy projects) are also permissible. The exact level of GHG removals required by ELDC is still not clear…
… standard of energy management & staff awareness £0 16 £0 £3,400 instant Commuting & travel Mileage management £0 56 £0 £0 instant Vehicle fleet Driver training & performance management £20,200 148 £136 £46,300 0.4 Council offices Centralised/remote control and monitoring of HVAC systems £10,000 40 £248 £8,000 1.3 Council offices, foreshore leisure infrastructure Fan & pump upgrades…
… of the energy consumption at all sites as a controllable resource (by implementing management procedures such as those outlined below); upgrading controls for heating, ventilation and air conditioning (HVAC) so that these multiple systems can be controlled and monitored remotely; upgrading fans and pumps within these systems; and upgrading fluorescent lighting to LED. Manage energy usage • Appointment…
… upgrade needs). Based on electricity consumption data, public toilet lighting is responsible for ~36,000 kWh of electricity consumption per annum and is understood to be a mix of low and high frequency fluorescent luminaires. Energy savings of 60-80% are assumed achievable by upgrading promenade and public toilet lighting to appropriate LED alternatives. Once LEDs are installed, additional savings…