Including the closely related term climate emergency.
… plan for the new leisure centre The current design was developed before the climate emergency was declared and has limited scope to be amended before construction. A phased retrofit plan should be developed to improve the building fabric, replace the proposed gas-fired CHP with a heat pump and ensure the PV array meets best practices. 3y Mine-water heating Start a pilot project using mine…