Search inside documents

Search method
Document type

Search results for "domestic properties"

1 result

Dorset Council

Direct link to progress report (PDF)

… upgrades, electricity infrastructure strengthening and heat pumps - all for installation by end June 2022. To include: • Over 40 roof mounted solar PV arrays tendered, designed, and installed, with an additional 50 due for installation before end of June 22 • Analysis of suitable properties for Building Management System (BMS) expansion completed - identifying 14 additional sites across estate…

… requiring new systems. All new BMS installations awarded to contractor, designed and underway. 4 installations completed, 10 due for completion by Summer 22 • Existing BMS controls upgraded/future-proofed in 69 properties. Further 18 due for completion by end of Summer 22 • Window upgrade at County Hall underway • Surplus furniture from office rationalisation re-used in other DC offices, depots…

… in 645 initial home visits for advice and/or insulation surveys • Of which 130 homes have had installation completed • 37 Cavity wall and 93 Insulation • 94 of these properties had additional enablement measures fitted to help improve the home’s ventilation alongside the cavity and loft insulation measures • 497 homes still being processed Local Energy Advice Partnership (LEAP) • 50 LEAP…

… rated properties have been contacted and are in the process of either improving energy efficiency of their homes or applying for an exemption as we enforce minimum energy efficiency standards in the private rental sector Facilitate low carbon new homes • An officer working group is exploring what can be done under existing planning policy framework to be as proactive as possible…

Alpha

This is a new service – your feedback will help us improve it.