Including the closely related term charge points.
… Net Zero Vision Scale Start Date End Date Cost Division Lead Role Co-owner 5.2.6 As part of the development of capital projects investigate the potential for Electric Vehicle charge point installation at the new car park near Sleaford railway station. Increase the availability of EVCPs in the district. District 01/10/2022 31/12/2024 ££ DECS Economic Development Manager…
… into Cranwell Aviation Heritage Museum architects’ feasibility drawings, and seek advice on number of charge points appropriate to site. District EVCPs considerations have been factored into the Cranwell aviation Heritage Museum architect feasibility drawings to promote the growth of charge points within our district. 5.2.3 Transport Switching to Electric Vehicles Investigate potential…
… charge points are included in the Affordable Housing specification, ensuring all new social housing to be built will be required to have EV ChargePoints installed. • The Lincolnshire Local Transport Plan is designed to cover the short, medium, and longer-term time horizons for transport and highways for the whole of Lincolnshire. Information on the LLTP can be found here: Local transport…
… contribute to strategic objectives 1, 4, and 7 of our Climate Emergency Strategy. The SMT champion for our Transport theme is our Chief Executive. Action Costing Scale £ = £1 - £10,000 ££ = £10,001 - £50,000 £££ = £50,001 - £500,000 ££££ = £500,001 - £5 million £££££ = £5 million + (£) = officer time/internal cost Additional climate activities related to Transport: • EV…